欧美无砖砖区免费,国产乱伦老熟女系列,欧美精品久久久久爆乳,三级在线看

CN EN

NEWS

The role of power transformers

Power transformers are one of the main equipment for power plants and substations. The role of the transformer is not only to increase the voltage to send electricity to the electricity area, but also to reduce the voltage to the voltage used at each level to meet the needs of electricity. In short, both boost and buck must be done by a transformer. In the process of transmitting electrical energy in the power system, voltage and power losses are inevitably generated. When the same power is delivered, the voltage loss is inversely proportional to the voltage, and the power loss is inversely proportional to the square of the voltage. Using a transformer to increase the voltage reduces the loss of power transmission.
Transformer is composed of two or more coil windings wound on the same core, the windings are connected by alternating magnetic field and work according to the principle of electromagnetic induction. The installation location of the transformer should be considered for easy operation, maintenance and transportation, and a safe and reliable place should be chosen. The rated capacity of the transformer must be reasonably selected when using the transformer. When the transformer is running at no load, a large amount of reactive power is required. These reactive powers are supplied by the power supply system. If the capacity of the transformer is too large, it not only increases the initial investment, but also makes the transformer run at no load or light load for a long time, which increases the proportion of no-load loss, reduces the power factor, and increases the network loss. This operation is neither economical nor reasonable. If the transformer capacity selection is too small, the transformer will be overloaded for a long time and the equipment will be damaged. Therefore, the rated capacity of the transformer should be selected according to the needs of the electrical load, and should not be too large or too small.
2019/06/03 13:48:46 4802 次

Related Documents

Contact:Mr. YuanTel:+86-510-87846969 Fax:+86-510-87848616
E-mail:yxwb@vip.163.comAdd:Wanshi Town Industrial Concentration Zone, Yixing City, Jiangsu
Copy right ? 2019 Yixing Wansheng Transformer Co., Ltd.
heyzo在线播放| 欧美久久香蕉视频| 亚洲中文欧美日韩| 你懂得| 日韩无码高清一区二区三区| 久久婷婷五月综合色国产| 亚洲日韩色网站| 91精品人妻中文字幕在线| 九一香蕉视频| 国产亚洲Av码Av男人的天堂| 欧美第一色区| 日本久久精品| 天堂网在线| 午夜无码福利| 无码人妻精品一二三区免费| 久久中文精品无码中文字幕| 激情综合网五月| 无码AV中文| 国产青青操| 色丁香| 免费看黄片视频| 饶平县| 91欧美在线免费观看| 中文字幕人妻丝袜美腿乱一区三区| 亚洲国产精品久久久久师婷密牙| 人人妻人人澡人人爽人人dvd| 日韩色久| 国产亚洲日本精品| 国产精品久久久久久久久免费| 日本123区视频在线观看| 国产精品 青青草| JUQ-欧美一区二区三区| 国产成人精品必看| 欧洲亚洲香蕉视频| 日本三级片久久久久久久国产| 91国自产精品中文字幕亚洲| a吖天堂网2020| 亚洲精品美女久久久久9999| 五月婷婷深受| 久久久久久国产毛片| 亚洲国产精品无码7777一线|